Working for a leading house builder, we were asked to install over 2000 meters of bespoke ball top railing, on three housing developments on Salisbury Plain for the MOD. All to be completed within 18 months.
The railing was installed around various plots as they neared completion. Curved sections, handrails and difficult shapes all needed to be surveyed, drawings produced for sign off, railings made, galvanised and powder coted, before our fitting team installed onsite.
Working in difficult conditions at times, all the installations where completed on time, to the high standards set by the MOD.
Feel free to give us a call on 01225 811367 or by email at sales@thegreatgatecompany.co.uk